May 14, 2008
All of the instruments are on the Orbiter! LROC arrived on May 9th, and it is now installed. The Mini-RF antenna is not yet installed, but the electronics are on the avionics panel and have been connected to the Orbiter electronics. We have a lot of testing ahead of us, but the integration phase is nearly complete. Everything is now at Goddard Space Flight Center. The Solar Array System and the High-Gain Antenna System are the last two components to integrate. SAS final assembly is underway, and the HGAS is in the thermal vacuum chamber undergoing its final testing.
LRO is in the clean room after LROC integration.
< Earlier | Next
+ Go to Assembly Progress
|